top of page

The Steel District Construction Goes Vertical

The Steel District takes shape as construction starts going vertical. The first structure going vertical on the site is the parking ramp which is wrapped in more than 200 condos and lofts and thousands of square feet of ground-floor commercial space.

Stay tuned for more updates as construction continues and The Steel District comes to life.

Comentários


bottom of page